I-10

FDOT hosts final public meeting for proposed I-95 improvements from I-10 to Beaver Street

FDOT hosts final public meeting for proposed I-95 improvements from I-10 to Beaver Street

The Florida Department of Transportation (FDOT) hosted its final public hearing for the I-95 Project Development and Environment (PD&E) Study from I-10 to Beaver Street on Feb. 2. A kick-off meeting was first held last August to introduce the study and its proposed improvements along this corridor of the I-95 to the public and open […]

FDOT rolls out study for I-95 improvements from I-10 to Beaver Street

FDOT rolls out study for I-95 improvements from I-10 to Beaver Street

The Florida Department of Transportation (FDOT) hosted a pair of public meetings last month to present a study featuring proposed improvements to I-95 from I-10 to Beaver Street. The Project Development and Environment (PD&E) study presented “options to improve safety, capacity, and traffic operations on I-95” including adding two 12-foot lanes in each direction of […]

Excitement builds across the river as Fuller Warren Shared-Use Path nears completion

Excitement builds across the river as Fuller Warren Shared-Use Path nears completion

Construction on the Fuller Warren Bridge expansion and its shared-use path — as part of the improvements to the I-10/I-95 interchange —  began in 2017. Six years later, work on the bridge’s pedestrian- and bicycle-friendly path is near completion and it is expected to open this fall amid much fanfare on both sides of the […]

Highway construction projects chugging along

Highway construction projects chugging along

While it may seem as though I-10 and I-95 are forever under construction, there is light at the end of the tunnel. The $126 million project, which began in March 2017, is slated for completion in late 2020. According to Daryl Goss, Community Outreach Specialist for the Department of Transportation, the overall project is at […]